April 2014

Crossett, AR:
Union Pacific Railroad transported three large tank parts ranging from 26' to 28' high under aerial cable. KCCI aerial crews cut and restored the cable and drops at five locations and raised the cable at 6 locations in order for these tanks to pass through the streets. Foreman Larry Wilhite supervised the job. He and his crews pulled off the job without a hitch.
 

Klaasmeyer Construction